top of page

Current Projects

Phase 1 - Water Project

The water bill at the home is very high, unmanageable and a major concern.  Poor plumbing keeps the bill high with no funds for maintenance.

 

We are currently organizing a second water system to capture rainwater from the dorm roof and store water it to reduce the costs.

This is Phase 1

Thank you
Sand Depo for donating all the mall.

Thank you
Archie White for donating the cement

WhatsApp Image 2022-11-11 at 12.03.12 PM.jpeg

Phase 2 - Another base & More Tanks

After building the first base the home received 2 more drums totalling 4 drums. 

 

We went back to build another base.

We also measured up to buy fixtures and fittings to run the water to the tanks

WhatsApp Image 2022-11-11 at 11.43.50 AM.jpeg

Phase 3 - Kitchen Blues

Currently, the staff carries these large pots of water 3 times a day to cook food and wash dishes for the 50 children.  It's too much work!  One of the tanks we have will go on top of the building. We will use a pump to supply running water and save a lot of hard work. Please help us pay for the pump.

We Need Your Support Today!

bottom of page